Case Study
Vametco Mine
-
Location
Vametco Mine, Brits, North West
-
System size
4.725 MWp + 4 MWh vanadium flow battery
-
technology
Ground-mount solar PV + vanadium flow battery
-
Industry
Other
-
The challenge
Every successful project begins with a clear understanding of the client’s operational environment, energy requirements, and long-term business objectives.
Bushveld Minerals needed to reduce the mine’s electricity costs and establish a commercial-scale pilot for long-duration vanadium flow battery storage, including time-of-use shifting and better energy utilisation.
The site combined unusual challenges: highly reactive heaving clay that demanded careful civil and foundation design; construction inside an operating mine under strict health and safety rules; coordination with CellCube specialist teams; and RETEC / grid-code compliance for a then-novel behind-the-meter PV and flow-battery plant.
-
Our solution
Working closely with the client, our team designed a solution that balanced engineering excellence, financial viability, and long-term operational performance.
Nesa Power delivered 4.725 MWp of solar PV and a 1 MW / 4 MWh vanadium redox flow battery, covering about 10% of Vametco’s electricity requirement and avoiding more than 5,700 tonnes of CO₂ a year, funded off-balance-sheet through a long-term PPA.
PV, battery and the existing mine network were treated as one integrated power system. Control philosophy coordinates solar production, battery charge and discharge, peak demand, time-of-use tariffs and the electrical limits of the mine network. Agreeing grid-code, control and testing requirements early avoided major redesign or commissioning delays.
-
Looking ahead
Planning your own energy project?
Every business has unique energy requirements. Speak to our team to explore a solution designed around your operational and financial goals.